A Case Study on Toyota Production System – Free Download

Overview of the Toyota Production System
• Overproduction – Producing more than the customer demands.
• Waiting –Waiting for material, information, equipment, tools, etc.
• Transportation – Material should be delivered to its point of use. Should use the concept of point-of-use-storage
(POUS).
• Non-Value-Added-Processing – Reworking ,re-inspecting etc..
• Excess Inventory – Related to Overproduction, inventory beyond that needed to meet customer demands.
• Defects – Production defects and service errors waste resources.
• Excess Motion – Unnecessary motion is caused by poor workflow, poor layout, housekeeping, and
inconsistent or undocumented work methods.
• Underutilized People – This includes underutilization of mental, creative, and physical skills and abilities of Individuals.